S & J Maintenance will be finishing the window washing project on Saturday, September 29th. The remaining areas include the 6th floor China Basin Street deck windows and 1 single man basket drop on the East Tower, street side.
The areas below have been completed:
• West Tower
• Courtyard Windows, 3rd – 5th Floors
• 6th floor private decks
• 6th floor China Basin Street decks
• East Tower south facing windows
• The 10 story mid-rise between the East and West Towers
• 7th Floor Common Area Walking Deck glass and glass rail cleaning
• 7th floor walkway glass and glass parapet walls
• 2 Single man basket drops on the East Tower